43°44′N · 7°25′E
UNDERWAY · 14:08 UTC
SYS-02: VESSELS

Know what needs attention — before the owner steps onboard.

OPERATIONS INTELLIGENCE FOR PRIVATE VESSELS AND FLEETS.
MAINTENANCE · CREW · CERTIFICATES · CHARTER READINESS.
BUILT FOR THE CHIEF ENGINEER, THE CAPTAIN, AND THE OWNER REP.

ASSET · 001 — REFERENCE VESSELLIVE
M/Y Lady M
REFERENCE VESSEL · ON FRAME SINCE 2024
CLASS
VESSEL
LENGTH
164 FT
BUILD
LÜRSSEN
PORT
MONACO
READINESS
97%
STATUS
UNDERWAY
SEC / 02

Owner arrives 14:00. Vessel is ready.

M/Y LADY M · 164FT · MONACO — BRIEF COMPILED BY FRAME · 04:00 UTC
Vessel readiness164 FT · LÜRSSEN
0%
Crew & certs4 ABOARD · STCW CURRENT
0%
Charter packITINERARY · PROVISIONS · PERMITS
0%

WHAT FRAME DID THIS MORNING

  • VERIFIED ALL 4 STCW CERTIFICATES EXPIRE ≥ 90 DAYS OUT
  • CONFIRMED CHEF PÉREZ PROVISIONS DELIVERED 09:12
  • PRE-CLEARED CHARTER ROUTING THROUGH MONACO PORT AUTHORITY
  • RECONCILED WHATSAPP MESSAGES FROM CHIEF ENGINEER INTO 3 WORK ORDERS

WHAT NEEDS ATTENTION BEFORE 14:00

  • WO-2841 · COMPRESSOR INSPECT — AIRTECH INC. ETA 13:45
  • TENDER 2 · FUEL POLISH OVERDUE 4 DAYS — SCHEDULED TOMORROW
  • OWNER SUITE · LINEN CHANGE IN PROGRESS — COMPLETES 12:30
SEC / 03

Preventive maintenance, without the chaos.

EVERY SYSTEM, EVERY CYCLE, EVERY OVERDUE TASK — IN ONE LEDGER. FRAME SURFACES WHAT'S LATE, WHAT'S COMING, AND WHAT'S DONE. WITHOUT ANYONE ASKING.

OVER · 4D
Tender 2 · Fuel polishCYCLE: 90 DAYS · LAST: 14 FEB 2026
14 FEB
OVER · 1D
HVAC #2 · Compressor inspectionWO-2841 AUTO-GENERATED FROM FC-142
21 MAY
UP · 3D
Main engine · Oil sample & analysisCYCLE: 250 HOURS · 247 CURRENTLY
25 MAY
UP · 9D
Tender 1 · Annual surveyCLASS SOCIETY PRE-INSPECTION
31 MAY
DONE
Stabilizers · Hydraulic flushCOMPLETED BY NAUTICALPRO · INVOICE ON FILE
18 MAY
DONE
Watermaker · Membrane swapFC-204 CLOSED · VENDOR SLA 4.9
12 MAY
SEC / 04

Every task, done the same way.

A PROCEDURE IS THE SAME ON MONDAY AS ON SUNDAY. SAME ON THE NEW MATE'S FIRST MORNING AS THE CHIEF ENGINEER'S LAST. FRAME ENFORCES THE PATH.

01 · SOURCE
Manual referenceHVAC V4.2 · §4.2 · PP. 47
INDEXED BY FRAME 12 MAY · CROSS-LINKED TO FAULT CODES
02 · PROCEDURE
SOP-07 invokedCOMPRESSOR OVERPRESSURE RESPONSE
REVISED JAN 2026 · ENFORCED ON WO CREATION
03 · ASSIGNMENT
Crew member assignedCHIEF ENG. M. ROSSI · PRIMARY
ACKNOWLEDGED 09:14 · ESTIMATED 90 MIN
04 · EXECUTION
Vendor coordinationAIRTECH INC. · ETA 13:45
PRE-CLEARED PORT ACCESS · INVOICE PREPPED
05 · VERIFICATION
Sign-off & closeWO-2841 CLOSES WITH PHOTO + SIGNATURE
PROVENANCE LOGGED · AUDIT-COMPLETE
SEC / 05

Operational history, with context.

THE LOGBOOK IS NOT AN AFTER-THE-FACT ARCHIVE. EVERY ENTRY CARRIES THE MANUAL, THE FAULT CODE, THE VENDOR, AND THE SIGN-OFF IT CAME FROM. YEARS FROM NOW, YOU'LL KNOW EXACTLY WHAT HAPPENED.

22 MAY09:14 · UTC+02
WO-2841 ACKNOWLEDGED. COMPRESSOR #2 PSI ELEVATED TO 312 AGAINST CEILING 310 PER MANUAL V4.2 §4.2. AIRTECH INC. DISPATCHED, ETA 13:45. OWNER ARRIVAL 14:00, BRIEF UNAFFECTED. CHIEF ENGINEER · M. ROSSI — LINKED: WO-2841 · FC-142 · MANUAL V4.2
21 MAY17:08 · UTC+02
CHARTER PACK PRE-CLEARED. ITINERARY LOADED, PROVISIONS CONFIRMED WITH CHEF PÉREZ, PORT AUTHORITY CLEARED. FRAME COMPILED BRIEF. NO HUMAN INTERVENTION REQUIRED. CAPTAIN · L. FOURNIER — LINKED: CHARTER-2026-052 · PERMIT MC-44
18 MAY11:22 · UTC+02
STABILIZERS HYDRAULIC FLUSH COMPLETED BY NAUTICALPRO. SAMPLE ANALYSIS ATTACHED. FRAME CLOSED WO AND LOGGED INVOICE; SLA 4.9 MAINTAINED. ENGINEER · K. PETROV — LINKED: WO-2839 · VENDOR NAUTICALPRO
SEC / 06

Manuals, SOPs, vendors. Encoded.

INSTITUTIONAL KNOWLEDGE IS RARELY WRITTEN DOWN — AND NEVER INDEXED. FRAME CORES DOWN THROUGH EVERY LAYER OF IT, VESSEL BY VESSEL.

Manuals
HVAC · ENGINES · STABILIZERS · WATERMAKER — 47 DOCS
FULL-TEXT INDEXED · CROSS-REFERENCED TO SOPS AND FAULT CODES
SOPs
62 PROCEDURES · ISM-ALIGNED
ENFORCED ON WORK-ORDER CREATION · REVISED Q2 2026
Faults
340 CODES MAPPED · MARINE SYSTEMS
FC-142 · COMPRESSOR OVERLOAD — EXTRACTED FROM MANUAL V4.2
Incidents
11 LOGGED · 9 RESOLVED · 2 OPEN
LINKED TO WORK ORDERS · PROVENANCE PRESERVED
Vendors
38 APPROVED · MEDITERRANEAN & CARIBBEAN
AIRTECH · NAUTICALPRO · MEDYACHTSUPPLY — SLA TRACKED
History
SINCE 2021 · 5 YEARS
218 CLOSED WOS · 4 SURVEYS PASSED · AUDIT-COMPLETE
SEC / 07

What's quietly getting worse.

CRITICAL ISSUES, OVERDUE PMS, EXPIRING CERTIFICATES. FRAME SURFACES THEM WHILE THERE'S STILL TIME.

PMS OVERDUE
0
TENDER 2 FUEL POLISH · HVAC #2 INSPECTION — BOTH FLAGGED IN THE READINESS BRIEF, VENDOR DISPATCHED.
CERTS EXPIRING
0 <60D
SMC · RADIO OPERATOR · MEDICAL KIT — ALL ON SCHEDULE FOR RENEWAL, CLASS SOCIETY NOTIFIED.
REPEAT FAULTS
0
COMPRESSOR #2 · THIRD OCCURRENCE IN 14 MONTHS — PATTERN DETECTED, ROOT-CAUSE REVIEW RECOMMENDED.
AUDIT TRAIL
0%
LOGBOOK ENTRIES · 5-YEAR WINDOW — EVERY ACTION RECORDED WITH FULL PROVENANCE.
PRIVATE ONBOARDING
Run vesselson Frame.

BY INVITATION ONLY · 4–6 WEEKS WHITE-GLOVE · NO SELF-SERVE

REQUEST DEMO →
VESSEL SIZE30 – 300 FT
USE CASEPRIVATE · CHARTER · FLEET
STANDARDSISM · ISPS · STCW
ONBOARDING4–6 WEEKS WHITE-GLOVE
REFERENCEAVAILABLE ON REQUEST
REPLIES WITHIN ONE BUSINESS DAY · BY APPOINTMENT ONLY